1. Project Overview In November 2026, the Super Automatic Distribution Transformer Test System supplied by Nanke Electric to SANIL ELECTRIC CO., LTD. in South Korea was officially commissioned. This marks another purchase of a transformer testing sys...
In November 2026, the Super Automatic Distribution Transformer Test System supplied by Nanke Electric to SANIL ELECTRIC CO., LTD. in South Korea was officially commissioned. This marks another purchase of a transformer testing system from Nanke Electric by SANIL Electric, reflecting the customer's recognition of Nanke Electric's products and testing solutions.
Headquartered in Ansan, Gyeonggi-do, South Korea, SANIL ELECTRIC CO., LTD. is a specialized manufacturer of transformers and reactors. The company began as a reactor manufacturer in 1987 and has since grown into a power equipment manufacturer serving global markets. Its main products include oil-immersed transformers, cast-resin transformers, dry-type transformers, reactors, and soft starters.

This project was configured to meet the customer's production testing requirements for dry-type transformers. The system supports the testing of dry-type transformers across different voltage levels, capacities, and impedance ranges, providing an automated transformer testing solution.
· Dry-type transformers rated at 34.5/0.4 kV, with capacities up to 15,000 kVA and an impedance range of 4%–14%;
· Dry-type transformers rated at 6/0.4 kV, with capacities up to 10,000 kVA and an impedance range of 4%–14%.
Maximum Loss: 180 kW.

1. Measurement of no-load loss and no-load current;
2. Calculation of no-load current as a percentage of rated current;
3. Measurement of load loss and correction to the reference temperature;
4. Measurement of short-circuit impedance and correction to the reference temperature;
5. Induced Voltage Withstand Test;
6. Power-Frequency Withstand Voltage Test.

1. One-Time Wiring for Multiple Tests. With a one-time wiring setup, the system can perform multiple tests in sequence without requiring rewiring between different test items. This reduces manual wiring operations, simplifies the testing process, and improves transformer testing efficiency.
2. Integration of Multiple Testing Functions. Multiple transformer testing functions are integrated into a single test system, reducing the need for multiple separate instruments and frequent switching between devices, as required in traditional testing setups. This makes the testing process more streamlined and convenient.
3. Automated Testing with Centralized Software Control. The testing process is centrally controlled through the testing software, and the system automatically performs the relevant tests according to the configured testing procedures. This reduces manual operations, increases the level of automation in the testing process, and helps improve transformer production testing efficiency.

Commissioning Date: November 2026
The successful commissioning of this project further expands the application of Nanke Electric's intelligent transformer test systems in the South Korean market.