Fully Automatic Transformer Core Test System Project for Jiangsu Yuantong Electric Co., Ltd.

Time: 2026-11-18

1. Project Overview

Jiangsu Yuantong Electric Co., Ltd. was established on August 26, 2008, and is located in Hai'an, Nantong, Jiangsu Province, China, with a registered capital of RMB 100.8 million.

The company holds several qualifications and certifications, including National-Level Specialized and Sophisticated "Little Giant" Enterprise, High-Tech Enterprise, and Provincial-Level Green Factory.

With a planned annual output value of RMB 600 million, the company put its Phase II digital factory into operation in June 2026. The facility covers an area of 52,000 square meters, and its core production line has achieved automation. Upon reaching its planned production capacity, the project is expected to produce 3,000 intelligent transformers and 1,500 ring main units annually, with transformer products covering voltage levels up to 220 kV.

图片1.png

Its main products include 10 kV, 20 kV, and 35 kV oil-immersed transformers, epoxy resin cast dry-type transformers, non-encapsulated dry-type transformers, amorphous alloy transformers, special-purpose transformers, and American-style and European-style prefabricated substations. The company also provides customized manufacturing services.

To meet Jiangsu Yuantong Electric's transformer core testing requirements, Nanke Electric supplied a fully automatic transformer core test system for transformer core no-load testing, supporting the company's testing and inspection processes during production.

图片2.png

2. Maximum Test Capability

· Maximum Output/Test Voltage: 600 V (L-L)

· Maximum Output/Test Current: 38.5 A

· Output Frequency Range: Adjustable from 45 to 200 Hz

3. Test Items

Transformer Core No-Load Test

The system measures and records the following parameters:

1. RMS voltage

2. Average voltage

3. RMS current

4. Average current

5. No-load loss

6. Frequency

7. Power factor

8. Percentage of no-load current

图片3.png

4. Project Highlights

1. Fully Automatic Testing and Data Management

The system adopts fully automatic control. Test operations can be initiated with a single click through the host computer software. In automatic test mode, the entire process, from test execution to test report generation and test data storage, requires no manual intervention. Upon completion of testing, the data is automatically saved to the database.

2. Remote Operation and Separation of High- and Low-Voltage Circuits

The system supports remote operation through the host computer software. The host computer communicates with the testing instruments via a LAN connection for command transmission and data exchange. This arrangement separates the control console from the primary test equipment in terms of high- and low-voltage circuits, helping protect the safety of test personnel.

3. Primary System Simulation and Visualized Test Monitoring

A primary system simulation diagram is displayed at the top of the host computer software interface. During testing, the voltage and current paths can be monitored at any time, allowing test personnel to gain a clearer understanding of the test system's overall configuration and operating principles.

5. Commissioning Date

The system was commissioned in November 2026.

图片4.jpg图片5.png